Countertop cost by material (installed, 2026)
| Material | Installed (per sq ft) | 40 sq ft kitchen |
|---|---|---|
| Laminate | $20 – $45 | $800 – $1,800 |
| Solid surface (Corian-type) | $35 – $75 | $1,400 – $3,000 |
| Butcher block | $30 – $60 | $1,200 – $2,400 |
| Granite (level 1–3) | $40 – $100 | $1,600 – $4,000 |
| Quartz (engineered) | $50 – $120 | $2,000 – $4,800 |
| Quartzite (natural) | $70 – $150+ | $2,800 – $6,000+ |
| Marble | $60 – $130+ | $2,400 – $5,200+ |
Prices include material, template, fabrication, standard edge, one sink cutout, and install. Premium edges, extra cutouts, and full-height splash add cost.
What's in a stone countertop quote?
When comparing bids, look for these line items:
- Slab / material — the raw stone or engineered slab (often 40–60% of total)
- Template & measure — digital or manual template of your cabinets ($100–$300)
- Fabrication — cutting, edge profile, cutouts, seams ($15–$35/sq ft)
- Install — delivery, setting, seaming, backsplash glue-up ($5–$15/sq ft)
- Extras — demolition, disposal, plumbing disconnect/reconnect
Low-ball quotes often exclude demolition, sink cutouts (billed as "extra"), or use an incomplete edge spec.
Quartz vs granite — which costs more?
In 2026, entry-level granite is often cheaper than entry-level quartz. At mid-range ($60–90/sq ft), the two overlap heavily. At premium tiers, exotic granite and quartz can both reach $120+/sq ft.
Deciding between them? See our quartz vs granite comparison for appearance, maintenance, heat tolerance, and household fit — not just price.
Laminate: not just 1970s Formica
Modern laminate counters use improved print technology and edge profiles. They are ⅓ to ¼ the cost of stone and install in one day. Best for budget refreshes, rental units, and laundry/mud rooms where stone is overkill.
Countertops in a full kitchen remodel
Countertops are one line item in a kitchen remodel — often 8–15% of the total project budget. Cabinetry and labor dominate. See our kitchen remodel cost guide for 2026 total project ranges by scope and finish level.
Timeline
- Laminate: template to install in 3–7 days
- Stone (quartz/granite): template → fabricate → install = 1–3 weeks from measure to finished counters
- Complex jobs: waterfall islands, mitered edges, or multiple slabs add days to fabrication
Order slabs early — popular quartz colors and exotic granite can be backordered weeks in 2026.
Ranges synthesized from HomeAdvisor, Fixr, and contractor survey data. Verify with 2–3 local quotes before committing.